Sort by
Refine Your Search
-
will have a duration of 12 months and is scheduled to initiate on 1st March 2024. 6 – Reserve list A reserve list for selection shall be drawn up for a 6-month period as from the date of the final
-
- Duration The Grant shall be awarded for a 1-year period. 6 – Reserve list A reserve list for selection shall be drawn up for a 6-month period as from the date of the final decision of this call. 7 – Activity
-
list A reserve list for selection shall be drawn up for a 6-month period as from the date of the final decision of this call. 7 – Activity Regime All the work shall be developed on an exclusive
-
selection shall be drawn up for a 6-month period as from the date of the final decision of this call. 7 – Activity Regime All the work shall be developed on an exclusive dedication regime, as per